PMI Accreditations Training

In Process... Keep watching this space......

spacer
Registration





CAPTCHA image
Enter the code shown above in the box below
Send

 
spacer
Minimize Registration
Records per Page
Page 9 of 14First   Previous   4  5  6  7  8  [9]  10  11  12  13  Next   Last   
Ravi Grover   rgrover@myself.com   Feedback   3/21/2011 9:30:51 PM
Project Procurement Please let me know the available openings in area of Project Procurement. Submitted By: Ravi Grover

aidan hanberry   aidan.hanberry@btinternet.com   AACEi Accreditations Registration   2/27/2011 10:13:11 AM
Cost Engineering I would like to obtain a Accreditation in Cost Engineering Submitted By: aidan hanberry

Luiz Antonio   luizantonioh@gmail.com   AACEi Accreditations Registration   2/22/2011 6:37:11 AM
AACEI AACEi Accreditation Trainings Submitted By: Luiz Antonio

Katie Begg   katie.begg@monitor-mpower.com   Feedback   2/7/2011 6:45:37 AM
Mpower Hi At Monitor we provide software solutions for all areas of project management. Mpower is our key product that encompasses project controls. We would appreciate consideration of listing on your site in the 'tools' section. Thanks Katie Marketing Manager Submitted By: Katie Begg

aditya katakam   aditya.subramanyam3@gmail.com   Feedback   2/7/2011 12:42:49 AM
project on microcontroller hi friends plz help me with my project.my project is solar tracker using microcontrlloer. Submitted By: aditya katakam

Matt   mattreynolds6@gmail.com   Feedback   2/4/2011 12:26:06 PM
Job Postings? Are you still offering to post jobs for free or did that offer runout as of 12/31/10? Thank you for your time. Matt Submitted By: Matt

higgins   lindsay.higgins@uk.thalesgroup.com   Feedback   2/3/2011 6:25:18 PM
Unregister I am only visiting your site to 'unregister' but I can't because I've never visited before and i can't log in. Please remove me from your mailing list. I NEVER signed up for your mailings. Submitted By: higgins

Simon   Simon@optimise-gb.com   Feedback   1/30/2011 11:46:39 PM
Unsubscribe Please take me off thesunscrption list Submitted By: Simon

Craig Golby   craig.golby@dignitas.ltd.uk   Feedback   1/30/2011 5:56:54 PM
Project Control Tools We would be interested in what opportunities would be available to associate with Project Controls Online.... CredAbility is a Secure, Web Based, Project Control Toolset, providing the key Risks, Issues, etc along with Change Control and Time & Financial Management. We are different because we present these things in a Hierarchy, 4 Levels, starting at the base with a Project, working up through Programme, Subsidiary and topping off at Corporate. Within each Corporate, there can be many Subsidiaries, in each Subsidiary, many Programmes and so on. The hierarchy is described in this way for ease, in reality it can be used to support any 4 level requirement. The end result is the same, that visibility and reporting are available at all levels and Corporate reporting and oversight is much easier. http://www.credability.info Get in touch Regards Craig Golby Managing Director Dignitas Ltd Submitted By: Craig Golby

Ahmad Assaf   assaf_ca@yahoo.com   Feedback   1/27/2011 3:58:10 PM
Can not download Hi, I just paid for downloading the PC functions 17 candian dollars and the link does not open, please send me the pdf on my e-mail Thanks Ahmad Assaf Submitted By: Ahmad Assaf

  
spacer