Welcome to Free Resources/Library section

Registered users here can upload and download files which they think may benefit community members. Please be responsible while uploading and make yourself aware of any copyright issues. ProjectControlsOnline will not be held responsible for any breach in rights and responsible user will be accounted for the same.

Please note the following types of files are allowed jpg, jpeg, jpe, gif, bmp, png, doc, docx, xls, xlsx, ppt, pptx, pdf, txt, xml, xsl, css, zip, csv and the size limit is 10 MB per file. You MUST be logged in to access/download the content.

Request from PCO members : We have received numerous requests from our practitioners on populating this library with standard schedules for various business sectors such as Oil & Gas, Power, Infrastructure, Offshore, Renewable Energy project etc.. If you have worked on this types of projects and are in position to share your knowledge here, please do so.

Search
Impact of Adverse Weather Conditions on Completion Time of Offshore Construction Projects
Thumbnail
A project schedule is a mandatory tool to achieve control of time, cost and quality. The
schedule helps management in having a clear vision for the project tasks and required
resources to execute those tasks.

Offshore construction projects are highly vulnerable to weather than other types of
construction because of constant exposure to environment.

This study is intended to assist various parties involved in offshore
construction in better understanding and allocating risk of weather related delays in their
construction contracts before they occur.


File size 6298 K
Downloads 4
Date Wed 02/15/2012 @ 02:53
Author Ibrahim Rashed
EMail hiema581@yahoo.com
RATING:   COMMENTS (0)  

Primavera Basics, Tips and Tricks
Thumbnail
Primavera Basics, Tips and Tricks to help you understand more on Activity Date Fields, assuring Project Integrity with “Schedule Log”, Understanding ‘Percent Complete’, Valid Relationships To / From Milestones, “Commit” & “Refresh” DB, “Fill Down” and Using “Undo”..

File size 518 K
Downloads 29
Date Mon 12/19/2011 @ 07:10
Author Chris Brace
EMail Chris.Brace01@gmail.com
RATING:   COMMENTS (0)  

The construction of filters in Primavera to help maintain good schedule metrics
Thumbnail

The construction of filters in Primavera to help maintain good schedule metrics. By: Tom Reichner at Keylogic Systems, Inc.



File size 216 K
Downloads 25
Date Thu 11/17/2011 @ 03:41
Author Tom Reichner
EMail treichner@yahoo.com
RATING:   COMMENTS (0)  

WBS Example for an EPC Project
Thumbnail
WBS Example for an EPC Project

File size 39 K
Downloads 52
Date Thu 10/27/2011 @ 05:25
Author Chris Brace
EMail Chris.Brace01@gmail.com
RATING:   COMMENTS (1)  

Presentation on P6 EPPM R8.1- May 2011
Thumbnail
Presentation on P6 EPPM R8.1-  May 2011

File size 3131 K
Downloads 74
Date Wed 09/21/2011 @ 04:51
Author Pedram Daneshmand
EMail pedram.daneshmand@ugllimited.com
RATING:   COMMENTS (0)  

< BACK  1 of 5  NEXT >
spacer